NewsBlogResourcesPartner Portal
WhatsApp+1 (437) 475-8139
Clear Blue Technologies
  • Portfolio
Solar SavingsGet a Free Quote
Clear Blue Technologies

Subscribe to our newsletter for important news, industry insights & inside scoops:

Select topics you are interested in:

Solutions
  • Lighting Systems
  • Telecom & Energy
  • Technology
  • Products
  • Portfolio
  • Resources
  • Compare Providers
Company
  • About Us
  • News
  • Careers
  • Investors
  • Brochures
  • Contact Us
  • Support

Canada (HQ)

30 Lesmill Road, Unit 7

Toronto, ON, Canada M3B 2T6

+1 437 475 8139

WhatsApp: +1 647 693 0563

sales@clearbluetechnologies.com

Africa

Nairobi, Kenya

Lagos, Nigeria

Europe

Lidköping, Sweden

Deloitte Technology Fast 50, 2022 Canada Clean Technology Winner
FUTURE502022

Canada's Fastest-Growing

Sustainable Companies

REPORT
ON
BUSINESS

Canada's Top

Growing Companies

2021 & 2022

© 2026 Clear Blue Technologies Inc. All rights reserved.

Privacy PolicyTerms of UseContact
HomePortfolioFull-Brightness Solar Highway Lighting for Nevada DOT
Lighting

Full-Brightness Solar Highway Lighting for Nevada DOT

Beowawe, Nevada, USANevada Department of Transportation
Full-Brightness Solar Highway Lighting for Nevada DOT
100% All Night
Brightness
Zero
Site Visits in 3 Years
IES RP-8
Standard Met

Overview

Clear Blue powers Cooper roadway lights at a highway intersection in Beowawe, Nevada. They run at 100% brightness all night and meet ANSI/IES RP-8, with no grid connection.

The Challenge

NDOT needed roadway lighting at a highway intersection in Beowawe. Running a new grid line to the site meant trenching and wiring, and that cost adds up even over a short distance. The site sees temperatures from -5°F to 110°F, with snowstorms and high wind. Manual site visits for maintenance are costly and slow.

Our Solution

Clear Blue paired Cooper Archeon luminaires, the fixtures NDOT specified, with a Valmont pole and Clear Blue smart off-grid power. Lighting was modeled in AGI to meet every ANSI/IES RP-8 roadway lighting requirement at full brightness, with no dimming through the night. The Clear Blue smart controller and Illumience™ cloud platform manage energy automatically and let the system be monitored and adjusted remotely.

Results

  • Lit all night, every night, at 100% brightness with no dimming.
  • Meets ANSI/IES RP-8 roadway lighting standards.
  • Three years of operation with no in-person site visit needed.
  • No grid connection and no power bill.
  • Uses the Cooper fixtures NDOT already specified, so the lighting design did not have to change.

Products Used

Cammi

Project Details

Category
lighting
Subcategory
roadway
Location
USA
Client
Nevada Department of Transportation

Have a Similar Project?

Let us design a custom solution for your requirements.

Contact Us

Related Projects

Wingbury Paris Parking Lot
Lighting
Paris, Ontario, Canada•Wingbury

Wingbury Paris Parking Lot

Wingbury Properties Ltd., a Brantford-based real estate development and property management firm, partnered with Clear Blue to light a commercial parking lot at 30 Mechanic Street in Paris, Ontario. Two Senti Ampio solar luminaires deliver light levels that exceed ANSI/IES RP-8-18 recommended practices, providing safe, standards-compliant illumination with no grid connection and no ongoing energy costs.

Senti
View Project
The Village of New Maryland
Lighting
Village of New Maryland, New Brunswick, Canada•Village of New Maryland

The Village of New Maryland

Clear Blue provided 13 Smart Off-Grid lighting solutions for sidewalk lighting along a roadway in the Village of New Maryland, New Brunswick.

Illumient
View Project
Algonac Waterfront
Lighting
Algonac, Michigan, USA•City of Algonac

Algonac Waterfront

Clear Blue provided its Illumient Smart Off-Grid lighting solution on a boardwalk along the bank of the St. Clair River in Algonac, Michigan.

Illumient
View Project
Back to All Projects